Infrastructure Acceleration Fund Kaikohe Water and Wastewater Upgrades

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 31252810
Tender Name : Infrastructure Acceleration Fund Kaikohe Water and Wastewater Upgrades
Reference # :
Open Date : Wednesday, 12 March 2025 9:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Monday, 28 April 2025 3:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72140000 - Heavy construction services
  • 72150000 - Specialized trade construction and maintenance services
  • 83101500 - Water and sewer utilities
  • 95100000 - Land parcels
  • 95110000 - Thoroughfares
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Raelene Rankin
+6494015410
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

An application for funding from the Infrastructure Acceleration Fund (IAF) has resulted in funding being made available for significant upgrades to the wastewater and water networks in the Far North township of Kaikohe. This project is an important enabler to enhance the resilience of the water and wastewater networks and optimise capacity for future growth through the planned development of approximately 365 new homes.

This project incorporates:

Taraire Hills Water Treatment Plant Upgrade - upgrading the existing water infrastructure including new water treatment infrastructure, electrical upgrades a new intake from the Wairoro Stream and a new 1,500m³ treated water reservoir.

Water Supply and Reticulation Upgrade - the construction of new water reticulation including the supply and laying of approximately 3,550m of new pressure pipe with associated valves, air valves and associated fittings.

Wastewater Reticulation Upgrade – the construction of a new pumpstation and rising main approximately 3,790m long, including the supply and install of new uPVC wastewater gravity pipelines approximately 2670m long and associated manholes, connections, and pipe bridges.