You are not logged in.

FNDC Contract 7/23/108 - EW PH3 - Whangae Road, Kawakawa

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 29591346
Tender Name : FNDC Contract 7/23/108 - EW PH3 - Whangae Road, Kawakawa
Reference # : 7/23/108
Open Date : Thursday, 13 June 2024 4:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 12 July 2024 11:00 AM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72140000 - Heavy construction services
  • 72150000 - Specialized trade construction and maintenance services
  • 95000000 - Land and Buildings and Structures and Thoroughfares
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Nicki Warner
094015186
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

This Contract is for the construction of a Modular Block Retaining wall on a concrete pad foundation with timber piles on Whangae Road in the Far North District.

The scope of the physical works comprises of:
• Traffic Management,
• Vegetation clearing,
• Installation of 2 rows, 1.4m apart timber piles 300mm Ø SED 5.5m (minimum 0.8m embedment in highly weathered Wapapa Terrane) @ 1.09m c/c topped by a 300mm thick 40MPa 664 mesh reinforced concrete pad and a Modular block wall on top.
• Pavement reinstatement

Far North District Council (The Principal) is seeking contractors who will:
• Complete the works on or before the Due Date for Completion
• Assist in providing a safe and more efficient network, minimising costs and increasing user satisfaction with the network;
• Implement and maintain high standards of health & safety and environmental practices and procedures;
• Undertake all practical measures to mitigate the social and environmental impacts of their activities;
• Provide value for money and increased price certainty in the procurement and construction of the Contract Works;
• Implement proactive strategies to enable the timely completion of the Contract Works;
• Develop and implement innovative work methods and/or Materials that result in enhanced performance and a cost-effective design;
• Commit to a co-operative approach to the Contract through a partnering process.