Tender Closed
|
|
RFx ID : | 29582622 |
Tender Name : | FNDC Contract 7/23/107 - EW PH3 - West Coast Road, Pangaru |
Reference # : | 7/23/107 |
Open Date : | Wednesday, 12 June 2024 3:00 PM (Pacific/Auckland UTC+12:00) |
Close Date : | Thursday, 11 July 2024 5:00 PM (Pacific/Auckland UTC+12:00) |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
Nicki Warner 094015186 |
Alternate Physical Delivery Address : | |
Alternate Physical Fax Number : |
This Contract is for the construction of an embankment with 3 rows of H5 treated timber piles 300mm diameter and 8m deep with column centers of 1.5m, installation of a new 600mm diameter
flexible plastic drain pipe and reinstatement of the existing road.
The scope of the physical works comprises of:
• Traffic Management, with special emphasis that the Contractor shall ensure that access is to be maintained at all times along the West Coast Road while works are underway.
• Vegetation clearing. I am in the process of working with an Ecologist who will advise whether we need a consent and what the Contractor has to comply with apart from the E&S Control Plan
• Installation of 3 rows of 300mm Ø driven timber piles at 8.0m deep @ 1.5m c/c with MSE embankment above comprising of 3 layers of 6.0m long TENSAR RE520 geogrid..
• Pavement reinstatement (with stabilised basecourse)
Far North District Council (The Principal) is seeking contractors who will:
• Complete the works on or before the Due Date for Completion
• Assist in providing a safe and more efficient network, minimising costs and increasing user satisfaction with the network;
• Implement and maintain high standards of health & safety and environmental practices and procedures;
• Undertake all practical measures to mitigate the social and environmental impacts of their activities;
• Provide value for money and increased price certainty in the procurement and construction of the Contract Works;
• Implement proactive strategies to enable the timely completion of the Contract Works;
• Develop and implement innovative work methods and/or Materials that result in enhanced performance and a cost-effective design;
• Commit to a co-operative approach to the Contract through a partnering process.