You are not logged in.

Te Hiku - Te Ahu Loop Running Track & Boardwalk (5-19-100)

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 24669329
Tender Name : Te Hiku - Te Ahu Loop Running Track & Boardwalk (5-19-100)
Reference # : 5-19-100
Open Date : Thursday, 12 August 2021 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Monday, 27 September 2021 11:00 AM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 21000000 - Farming and Fishing and Forestry and Wildlife Machinery and Accessories
  • 22000000 - Building and Construction Machinery and Accessories
  • 23000000 - Industrial Manufacturing and Processing Machinery and Accessories
  • 27000000 - Tools and General Machinery
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 70000000 - Farming and Fishing and Forestry and Wildlife Contracting Services
  • 72000000 - Building and Facility Construction and Maintenance Services
  • 73000000 - Industrial Production and Manufacturing Services
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Franz Wagner
Franz.Wagner@fndc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Contract Brief for potential Tenderers:

The Contract Works are for the construction of a 2.2m wide shared concrete path approximately 820m and a 2.4m wide timber boardwalk approximately 70m long along South Road in Kaitaia as part of the Te Ahu Te Hiku Shared Path Connection works.
This footpath commences on the stop bank at the northern most tip of the Te Ahu community centre and wraps around the main entrance area and continues along the north-eastern side of South Road and connects with the new footpath of the top car park of the Te Hiku sports hub. The routing traverses the road reserve of South Road for the most part but also cuts through the old filled-in Awanui riverbed.

Special features of this contract:
• 3 Separable Portions - SP1: Concrete path, SP2: Precast concrete tiles & SP3: Timber boardwalk,
• No straight sections i.e. path is to be constructed with a meandering alignment
• An 80m portion of concrete footpath to receive a permanent stylised tiles, reminiscent of the previous Awanui River meander.
• Meandering Boardwalk

This tender is for the construction of the Shared Path and the Boardwalk and the successful Tenderer for the Boardwalk will be expected to manage the interface of both sections of work to ensure a smooth transition and finish from each surface.

THE RFT identifies the contact name for raising questions relating to Te Hiku - Te Ahu Loop Running Track & Boardwalk (5-19-100).