You are not logged in.

Paua Shed Demolition

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 21722092
Tender Name : Paua Shed Demolition
Reference # :
Open Date : Thursday, 3 October 2019 2:30 PM (Pacific/Auckland UTC+13:00)
Close Date  : Thursday, 31 October 2019 4:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
  • 77000000 - Environmental Services
  • 95120000 - Permanent buildings and structures
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Warren Ure
+6494015202
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Tenders are invited for the demolition and disposal of the Paua Shed..

The Paua Building is an abandoned fertiliser shed on Lot 1 DP 91881, 4047m2, fee simple, owned by FNDC. This property is situated at the end of Te Pua Road which is a metal road off Paua Road, which itself is off State Highway 1F in the northern end of the Te Hiku ward. The property is isolated being approximately 1 hour’s drive north of the Kaitaia Township. Te Kao is approximately 20 minutes to the south which has a small residential settlement with a local store. Pukenui is a further 20 minutes’ drive south from Te Kao.

The works consist of;
• All professional pre and post inspection reporting requirements.
• All monitoring throughout the project.
• All vegetation is to be cut sufficiently and removed to expose soil to allow identification and removal of ACM.
• Deconstruction and removal of all asbestos containing material and surface contamination by suitably qualified company.
• Deconstruction and removal of all building elements not limited to steel and concrete structures.
• Earthworks, import fill if required to fill area of removed slab and seeded to re-establish natural environment.
• Any services to the property/shed to be disconnected at the source.
• Approved certified asbestos removal company profile and control measure plan submitted for approval prior to works commencing.