Te Maunga Aeration Upgrade

Details

Tender Closed
RFx ID : 17212946
Tender Name : Te Maunga Aeration Upgrade
Reference # : TC90/15
Open Date : Tuesday, 16 February 2016 8:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Tuesday, 8 March 2016 2:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 72141100 - Infrastructure building and surfacing and paving services
  • 72150000 - Specialized trade construction and maintenance services
  • 83101500 - Water and sewer utilities
  • 95000000 - Land and Buildings and Structures and Thoroughfares
Regions:
  • Bay of Plenty
Exemption Reason : None
Required Pre-qualifications : None
Contact : Richard Myers
richard.myers@tauranga.govt.nz
07 577 7000
Alternate Physical Delivery Address  : Tauranga City Council - 91 Willow Street - Private Bag 12022 - Tauranga
Alternate Physical Fax Number  :
Overview

PLEASE DO NOT SUBMIT ELECTRONIC RESPONSES

Tauranga City Council invites responses to it's Request for Proposals for the upgrading of the aeration blowers and diffusers at the Te Maunga Wastewater Treatment Plant. The project is being procured under a supply, design and install contract for the mechanical and electrical plant with some components of the detailed design for the electrical provided complete and included with the RFP document.

The Works include the following;

1. Installation, commissioning and testing of one additional direct drive centrifugal blower supplied by the Employer, with the associated removal of the existing HV Turbo blowers including demolition and modifications to the existing blower room

2. Replacement of the existing aeration basin diffusers and installation of additional diffusers (supplied by the Employer), design, installation and commissioning of diffuser grids and aeration manifold

3. Demolition of electrical works, design, supply, installation, commissioning and testing a new starter cell E1 into MSB 2 Bus A for the supply and protection of the new blower, a new control power distribution board into MSB 2 Bus A, new main incomer, generator incomer, auto transfer switch and interlock into MSB 2 Bus B, and electrical installation for the new blower, blower local control panel and control cabling