CON 25-17 Wyndham Museum demolition project

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 31099288
Tender Name : CON 25-17 Wyndham Museum demolition project
Reference # : CON 25-17
Open Date : Tuesday, 18 February 2025 1:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Wednesday, 26 March 2025 4:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • 22000000 - Building and Construction Machinery and Accessories
Regions:
  • Southland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Phil Fahey
phil.fahey@southlanddc.govt.nz
0800 732 732
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

This RFP relates to the procurement for the demolition of the museum including:
All temporary works required, including but not limited to, scaffolding, propping, underpinning required for the safe demolition of the building.
Demolition of roof, external masonry walls and all internal walls and fixings
Removal of floor, piles, and all concrete foundations.
Southland District Council encourage recycling as much as practicably possible.
All recycled material is to remain the property of the contractor undertaking the demolition and removed from site at contractors cost.
All unrecycled material to be removed from site and disposed of at an approved land fill.
Sewer and gray water to be terminated and capped at boundary.
Water to be terminated at existing toby box.
Electricity will be terminated by Southland District Council prior to demolition.
An asbestos demolition survey has been completed.
The building does contain small amounts of asbestos which will be removed prior to the demolition and not form part of this procurement. Upon completion the site will be levelled with topsoil and sown in grass.
Key milestones
Demolition and site reinstatement completed by 30/05/2025.