You are not logged in.

C-25-046 Hanleys Farm Wastewater Pumpstation Upgrade

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 30596740
Tender Name : C-25-046 Hanleys Farm Wastewater Pumpstation Upgrade
Reference # : C-25-046
Open Date : Wednesday, 13 November 2024 2:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Tuesday, 10 December 2024 12:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
  • 81101500 - Civil engineering
  • 81101700 - Electrical and electronic engineering
  • 83101500 - Water and sewer utilities
Regions:
  • Otago
Exemption Reason : None
Required Pre-qualifications : None
Contact : Tender Secretary
pmoprocurement@qldc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

QLDC is seeking an experienced contractor to undertake upgrades at Hanley’s Farm Wastewater Pumpstation (HFWWPS) to provide additional conveyance capacity within our wastewater network. The project broadly includes the installation of new pumps, new emergency storage tanks, along with ancillary electrical upgrades to facilitate the new pumps.

The scope of works broadly encompasses:

• Installing NP 3231/705 3 ~ 480 170kW pumps with 470mm diameter impellers to increase the station's pumped flow capacity from 122 L/s to 173 L/s.
• Strengthening the existing GRP wet well to accommodate the larger pumps.
• Upgrading emergency storage capacity with the installation of two new 2.5m diameter, 20m long GRP storage tanks and demolishing the existing overflow basin.
• Interlocking the pump stations to limit pumped flow between 170-190 L/s, ensuring network integrity and preventing surcharging.
• Design, supply and installation of the revised electrical panel to supply to upgraded pumps.
• Coordination of the transformer upgrade onsite (to be completed by Powernet)