11277 - Westgate Station Implementation : Main Works (PW)

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 30686898
Tender Name : 11277 - Westgate Station Implementation : Main Works (PW)
Reference # : 11277
Open Date : Friday, 22 November 2024 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Thursday, 12 December 2024 10:00 AM (Pacific/Auckland UTC+13:00)
Department/Business Unit : NZ Transport Agency - Highways and Network Operations
Tender Type : Registration of Interest (ROI)
Tender Coverage : All of Government  [?]
Categories :
  • 72100000 - Building and facility maintenance and repair services
  • 72110000 - Residential building construction services
  • 72140000 - Heavy construction services
Regions:
  • New Zealand
Required Pre-qualifications : None
Contact : Jo Moses
tender@nzta.govt.nz
099288730
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

The high-level scope of the works to be undertaken as part of the Main Works package includes:
• Construction of an open plan designed, station building and bus driver facility including amenities, retail areas, internal and external fittings and furnishes.
• Installation of all bus station hard infrastructure including kerb & channel, traffic islands, tactiles, speed tables, drains, ticketing and charging bollards.
• Concrete and asphalt pavement construction including access road, layover area, platforms, footpaths and the plaza forecourt.
• Placement of a barrier system on top of the retaining wall that was constructed as part of the Enabling Works package.
• Installation of permanent fencing for the site.
• Undertake all remaining utility construction for connections station building and services43.
• Installation of all traffic signs and markings within the station site.
• Modifications to Gunton Drive including traffic signal upgrades, traffic signs and markings installation, kerb and channel, footpath and surfacing renewal.
• Installation of street lighting, CCTV and other features necessary to achieve a safe environment within the station.
• Provision of landscaping including planting, topsoil and hydroseeding (where necessary).
• Installation of placemaking items and wayfinding to enhance the look and feel of Westgate Station.   
• Compliance with all Consenting requirements including the project specific Building Consent and Resource Consent conditions.

Please refer to attachment documents for further information.