C2810 Wastewater Flowmeter Installation Programme

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 31036557
Tender Name : C2810 Wastewater Flowmeter Installation Programme
Reference # : C2810
Open Date : Monday, 10 February 2025 3:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Friday, 28 February 2025 12:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Infrastructure - 3 Waters
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 47100000 - Water and wastewater treatment supply and disposal
  • 83000000 - Public Utilities and Public Sector Related Services
Regions:
  • Hawke's Bay
Exemption Reason : None
Required Pre-qualifications : None
Contact : Patricia van der Westhuizen
patriciaw@napier.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Napier City Council are looking for a contractor to install a programme of flow meters at wastewater pump stations across the city to provide data to inform current use and modelling for the future.

What we need?
- A general concept design has been completed for buried flowmeters; however, each site has its own intricacies and an element of onsite design for installation and connectivity is required. Following installation, as-built mark-ups are required to be submitted for engineering approval.
- A prioritised list of pump station locations and co-ordinates is attached to this Notice. The Contractor will work through the installation completing as many as possible to the Maximum Fee using the agreed Schedule of Rates.
- To mitigate the flow meter lead in times (6 – 8 weeks) the Principal will purchase a supply of flow meters in advance and make them available to the Contractor to complete the works and reinstatement within a timely manner.
- The electrical work and integration to SCADA is not included in the scope of this procurement.