RFx ID : | 30846953 |
Tender Name : | C2810 Wastewater Flowmeter Installation Programme |
Reference # : | C2810 |
Open Date : | Monday, 6 January 2025 9:00 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Monday, 10 February 2025 12:00 PM (Pacific/Auckland UTC+13:00) |
Department/Business Unit : | Infrastructure - 3 Waters |
Tender Type : | Notice of Information (Advance Notice) (NOI) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Required Pre-qualifications : | None |
Contact : |
Patricia van der Westhuizen patriciaw@napier.govt.nz |
Napier City Council are looking for a contractor to install a programme of flow meters at wastewater pump stations across the city to provide data to inform current use and modelling for the future.
What we need?
- A general concept design has been completed for buried flowmeters; however, each site has its own intricacies and an element of onsite design for installation and connectivity is required. Following installation, as-built mark-ups are required to be submitted for engineering approval.
- A prioritised list of pump station locations and co-ordinates is attached to this Notice. The Contractor will work through the installation completing as many as possible to the Maximum Fee using the agreed Schedule of Rates.
- To mitigate the flow meter lead in times (6 – 8 weeks) the Principal will purchase a supply of flow meters in advance and make them available to the Contractor to complete the works and reinstatement within a timely manner.
- The electrical work and integration to SCADA is not included in the scope of this procurement.