You are not logged in.

Main Contractor for N Block & various upgrade works at Te Awamutu College - ROI

Details

RFx ID : 31526597
Tender Name : Main Contractor for N Block & various upgrade works at Te Awamutu College - ROI
Reference # : 1236
Open Date : Monday, 28 April 2025 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Thursday, 15 May 2025 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Registration of Interest (ROI)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Waikato
Required Pre-qualifications : None
Contact : All communications must be made through the GETS Q&A function
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  :
Overview

The Board of Trustees for Te Awamutu College are seeking registrations of interest from suitable experienced main building contractors for the following scope:
(a) C Block (Part of MOE Block B):
• Replace fluorescent lighting in Computer Area & C3 with new LED fittings.
• Convert existing darkroom (ancillary to C3) into a media room. Form new dark room facilities in long space along the back of C1 & C2.
• Replace clearlite roofing to skylight above room C2 and above the central resource between C1 & C2 with trafficable material.
• Replace decking timber to deck, ramp and steps outside rooms C1 & C2 (quad side).
• Replace heating system in room C1 with heat pump.
• Fit underfloor insulation to rooms C1, C2 & C3 and the associated habitable ancillary spaces (resource, media, dark room).
(b) R Block (MOE Block C):
• Fit overflashings to 7 roof penetrations (remove skylights and cover) to low roof above toilets.
(c) N Block (MOE Block G):
• Rearrange student toilets to form 6 unisex cubicles with direct exterior access. Provide warm water to basins from existing HWC.
(d) M4 (MOE Block M):
• Replace existing heating system with a more energy efficient system that actually works.
• Upgrade fire alarm to Type 4.
(e) A Block:
• Replace heat pumps in staffroom.
(f) M2 & M3 (MOE Block L):
• Upgrade fire alarm to Type 4.
• Replace fluorescent lighting in M3 ancillary spaces with new LED fittings.