RFx ID : | 30747563 |
Tender Name : | Pinehaven School - Roofing Contractor - Block A & G Roofing Replacements - (Wellington) |
Reference # : | |
Open Date : | Monday, 2 December 2024 9:00 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Friday, 31 January 2025 5:00 PM (Pacific/Auckland UTC+13:00) |
Department/Business Unit : | Board of Trustees - Approve by BoT - ie. School Principal |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
All submissions to be made through the GETS website |
Alternate Physical Delivery Address : | All submissions to be made through the GETS website |
Alternate Physical Fax Number : | All submissions to be made through the GETS website |
The BOT at Pinehaven School are seeking the services of a main contractor to undertake the construction of Block A & G Roofing Replacements.
**Please price this as per the excel attached schedule of prices***
Construction Dates: April School Holidays 2025.
The work is described in the tender documents prepared by IR Group and involves:
• Isolate work area and operate under a SSSP.
• Erect scaffold and edge protection where necessary.
• Block A & G – Remove existing upper level roofing iron, paper, flashings, spouting, downpipes, membrane roof and skylight as outlined.
• Block A & G – Supply and install new roofing iron, paper, ventilated battens, membrane roof, flashings, custom made flashings, spouting and downpipes where necessary.
• Block G – Remove old light fittings and replace as indicated.
• Allow to isolate overhead power cables where necessary
• Allow to replace, or sand down any re-paint barge or fascia boards where necessary / outlined.
• Remove and dispose of existing roofing materials which are end of life.
• Provide all PS3’s, warranties, O&M manuals, weathertightness sign offs as necessary.
• Leave site clean and tidy.
• Project consultants are:
o Project Manager: IR Group
o Lead Designer: IR Group
Contractors should detail their plan to ensure an efficient delivery (eg. pre-order products, line up sub-contractors). Ensuring minimal disruption to the school and having an efficient programme are paramount.
The Contractor will be engaged through an MOE medium works contract (Construction contracts for professional services and works).
When responding, please ensure you complete
- Form of Tender Part A
- Form of Tender Part B
- Schedule of Prices – Broken Down Line Item by Line Item
- Programme