Main Contractor for Tōtara Park School (Wellington) Blocks C, J, M & S AMS Flooring & Internal Joinery Project

Details

RFx ID : 30561762
Tender Name : Main Contractor for Tōtara Park School (Wellington) Blocks C, J, M & S AMS Flooring & Internal Joinery Project
Reference # :
Open Date : Wednesday, 6 November 2024 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Monday, 2 December 2024 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : All enquiries to be made through the GETS Question & Answer function
Alternate Physical Delivery Address  : All tender submissions to be made through the GETS site
Alternate Physical Fax Number  : All tender submissions to be made through the GETS site
Overview

The BOT at Tōtara Park School seek the services of a Main Contractor to undertake AMS Flooring & Internal Joinery Replacements on Blocks C, J, M & S as described in the tender documents.

The works comprise of:-

General

• Isolate the work area/s.
• Fencing off the proposed site area and maintaining escape routes to all fire exits.
• Isolate, disconnect and remove services as required and detailed in drawings.
• Allow demolishing, removal, and disposal of all carpet & vinyl flooring as shown in the demo schedule.
• Remove and Replace floor coverings identified in the drawings (if any).
• General site preparation and clearance.
• Disposal of all construction waste.
• Leave site clean and tidy.

Block C (Library)

• Replace carpet floor coverings
• Remove carpet and replace with new carpet tiles throughout 1No. classroom.

Block J Interior

• Replace internal joinery
• Replace internal bi-fold doors with new to replace broken one.

Block M

• Replace carpet floor coverings
• Remove and replace with new carpet tiles throughout 2No. classrooms.

Block S

• Replace carpet floor coverings
• Remove carpet and replace with new carpet tiles throughout 1No. breakout room.