You are not logged in.

Puketaha Wastewater Upgrade

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 29916016
Tender Name : Puketaha Wastewater Upgrade
Reference # :
Open Date : Wednesday, 7 August 2024 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Wednesday, 11 September 2024 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Ministry of Education - Approval from Ministry Employee - ie. Case Manager
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • 47100000 - Water and wastewater treatment supply and disposal
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Bay of Plenty
  • Waikato
Exemption Reason : 14.9.b Following an open tender
Required Pre-qualifications : None
Contact : All enquiries to be made through the GETS Question & Answer function
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  :
Overview

We are seeking suitably qualified contractors to upgrade the existing wastewater system at Puketaha School as per below;

The existing wastewater system at Puketaha School currently does not meet the requirements of the
building code (AS/NZ1547 and G13/VM4:
 Puketaha School has investigated and had recommendations proposed in a report from
AboveWater consultants.
 The report stipulates a staged approach for the upgrade and installation of a new wastewater
system, drainage field and associated redirection of stormwater.
 This requires the installation of a new 4,500L dual chamber septic tank with new, manhole and
associated pipelines. Redirection of existing stormwater infrastructure away from the septic
system. Replacement of the existing Oasis treatment system with a new 6,500L Hynds septic tank
with baffle and pump chamber which will discharge to new raised AES wastewater disposal beds.
 The new system is to be suitably fenced off/isolated to prevent access by children.