Main Contractor for H Block Redevelopment at Otamatea High School

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 29348828
Tender Name : Main Contractor for H Block Redevelopment at Otamatea High School
Reference # : 239947
Open Date : Wednesday, 8 May 2024 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Wednesday, 12 June 2024 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : All enquiries to be made through the GETS Question & Answer function
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  :
Overview

Stage 1:
Demolition of Existing Tuck Shop and adjacent store room (including asbestos removal by certified asbestos removalist), construction of new H3 Healthy Lunches Kitchen and store rooms in space of existing Tuck Shop, Removal of existing temporary partition walls forming existing H2 and H3, modifications for new Food Technology Classroom H2 including specialist stainless steel fitout, new aluminium door and window joinery, new flooring, new suspended ceiling, new electrical fitout including new switchboard, new mechanical services and Fire Upgrade to Type 3 alarm system.

Access Upgrade (Separable Portion):
Removal of existing decking and deck joists, provision of new composite decking, new deck joists and new continuous packing over existing bearers to bring new decking level to within 15-20mm of existing Floor Level.
Removal of existing pavers adjacent to deck, and replacement with new concrete paving, ramped at 1:20 slope to meet new deck level.
Reposition stormwater catchpit and relay section of pavers to extent required to suit new catchpit location.
Replacement of existing Lobby doors with new asymmetrical doors and associated hardware for compliant accessible entry.

Stage 2 (Separable Portion):
Demolition of internal partitioning to existing staff workroom, Removal of existing Food Technology cabinetry/ existing fitout.
Provision of new toilets, new shared pantry between H1 and new H2.
New fitout to Food Technology Classroom H1 to match Stage 1 fitout of H2 Food Technology Classroom.