You are not logged in.

Main Building Contractor for 5YA Roofing, Windows Replacement, Electrical, Flooring, Heating + Drainage Works at Henderson North School, Henderson, West Auckland.

Details

Tender Closed
RFx ID : 29000477
Tender Name : Main Building Contractor for 5YA Roofing, Windows Replacement, Electrical, Flooring, Heating + Drainage Works at Henderson North School, Henderson, West Auckland.
Reference # :
Open Date : Thursday, 14 March 2024 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Thursday, 4 April 2024 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Registration of Interest (ROI)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Auckland
Required Pre-qualifications : None
Contact : All contact should be via the GETS system
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  :
Overview

The Contract Works required are:

ROOFING
Blocks 1,2,7 Resource Senior School, A Pool Changing Rooms, Toilets + Tuckshop: Replacement of the poor condition and end of life roof and gutter.
Blocks 4 ESOL- speech clinic, D Mill Room,3: Replacement of the poor condition and end of life box gutters.
Blocks 6 Library,9 2 crms + resource: Replace poor condition and end of life PVC gutters.
Block A Pool Changing Rooms, Toilets + Tuckshop:Replace poor condition and end of life clearlite.( Webglass)

WINDOW REPLACEMENT:
Block 1 Rooms 1-7 Window replacement:
Old silver aluminium windows are at the end of their economic life becoming hard to open and close and are draughty and not weathertight.

ELECTRICAL:
Blocks 1,4, A ; Switchboard upgrades with new metal lockable enclosures with full RCD protection.

FLOORING + HEATING: Blocks 1,3,6,9: Carpet, vinyl, pinboard, + heating replacement.
Blocks 6,9: Outdoor carpet replacement.

DRAINAGE:
Site: CCTV Drainage followed by targeted repairs.

There is possibly an element of asbestos present that will require an approved plan for removal, handling and disposal.