Tender Closed
|
|
RFx ID : | 28824240 |
Tender Name : | Design Build of a new Artificial Turf at TKKM o Wairarapa |
Reference # : | |
Open Date : | Wednesday, 14 February 2024 9:00 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Thursday, 7 March 2024 5:00 PM (Pacific/Auckland UTC+13:00) |
Department/Business Unit : | Ministry of Education - Approval from Ministry Employee - ie. Case Manager |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
All enquiries to be made through the GETS Question & Answer function |
Alternate Physical Delivery Address : | All submissions to be made through the GETS website |
Alternate Physical Fax Number : | |
Agency Address : | NEW ZEALAND |
Background
The Ministry of Education is seeking a design build contractor to construct an artificial sand based sports turf under a new all-weather canopy (by Others) over a new artificial turf. The is to be suitable for school sports activities. The scope of works is as follows,
•Provide full design services for the new turf
•Secure any building and planning consents for the works.
•Establish site and construction zone in a fenced off area with appropriate signage and SSSP.
•Setout the turf under the new canopy by others
•Construct the subbase, drainage, and new turf to suit your proprietary systems.
•Disestablish site and make good and damage caused by the construction.
•Provide all warranties.
Project consultants are:
Project Manager: Ian Rattray
Quantity Surveyor: Cory O’Roirdan
Design by contractor
Required solution (method and approach)
The Contract Works required,
i.Design Build services from a turf supplier
iiTurf dimensions 36.5 m long and 21.3 meters wide
iiWork to be undertaken in a single stage after the installation of the covered canopy by others.
iv.The Contractor will be engaged through a Medium Works Contract.
Timeframes for the Contract Works are:
Indicative start date: March 2024
Indicative Due Date for Completion: April 2024
No Winner Project shifted to an MOE Led Project