You are not logged in.

Main Contractor Sceince Lab Shift to E Block & Gym Changing at Taita College

Details

Tender Closed
RFx ID : 28234318
Tender Name : Main Contractor Sceince Lab Shift to E Block & Gym Changing at Taita College
Reference # :
Open Date : Monday, 9 October 2023 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Thursday, 16 November 2023 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : All enquiries to be made through the GETS Question & Answer function
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  :
Overview

Background
The BOT as Taita College seek a main contractor to deliver the scope of works is for Salvage of existing Lab fixtures and internal alterations and refurbishment to relocate the science Lab and technicians’ room into Block E along with building services works. There are minor upgrading works in the Gym Changing areas as well to be priced separately
• The works will be undertaken as a single stage during the school term under a CPU.
• The contractor will need to liaise with the school to ensure as little impact as possible on the school’s activities.

• Project consultants are:
o Project Manager: Ian Rattray
o Lead Designer: Krish Rudra – IR Group Ltd

Required solution (method and approach)
The Contract Works required are
• The nature of the works is internal alterations with
• Salvage of existing near new science fixtures from the current science labs in C Block for reuse in E Block
• Minor internal demolition and strip out in E Block
• New wall and floor finishes
• New joinery
• Changes to the electrical plumbing and gas services.
• The Contractor will be engaged through a Medium Works (Construction contracts for professional services and works).Timeframes are:
• indicative Start date: Early January 2024