Tender Closed
|
|
RFx ID : | 28161117 |
Tender Name : | Ngakonui A Block ILE |
Reference # : | 6089 |
Open Date : | Wednesday, 18 October 2023 9:00 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Tuesday, 14 November 2023 5:00 PM (Pacific/Auckland UTC+13:00) |
Department/Business Unit : | Board of Trustees - Approve by BoT - ie. School Principal |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
All queries to be made through the GETs website Q&A function |
Alternate Physical Delivery Address : | All submissions to be made through the GETS website |
Alternate Physical Fax Number : | |
Agency Address : | NEW ZEALAND |
The Contract Works required are:
• Floor Coverings in classrooms CR7/8/10 and 11
The existing floor coverings are worn and require replacement. Prepare floors and install new commercial wool carpet on a double bond underlay or install new commercial carpet tiles. Replace vinyl with new 2mm commercial vinyl rod-weld all joints.
• Lighting: -
Upgrade/replace the existing older T8 fluorescent with new LED fittings complete with diffusers.
Add additional lighting to the corridor.
• RCD protection: -
The existing distribution boards have no RCD's or the RCD's they have do not meet current standards. Provide RCD to meet the latest Ministry of Education Electrical Installations Standard for Schools.
Contract Works Procurement Plan Full 2017-2 Page 2 of 12
• Acoustic ceilings: -
CR10 has a timber T&G ceiling. CR11 has pinex ceiling.
Install new suspended acoustic ceilings to these two classrooms, including allowance for ceiling insulation. Lighting set into the new grid suspended ceiling.
• Heating replacement: -
The heat pumps (6) in Block A are over ten years old and replacement is recommended in the first 5YA period (years 1-5) based on life cycle.
Replace with new heat pumps sized for heating and cooling capacity, and appropriate for the classroom areas/spaces.
Outdoor units to be at ground level (not roof mounted).
• Underfloor insulation: -
There is currently no underfloor insulation. Provide Expol (or similar) underfloor insulation.
• Other work: -
CR7 converted to become library. Relocate shelving etc. from existing library (Block L).
• CR8 & CR10 - Remove the internal walls and install large glazed aluminum stacker doors (or similar) to create flexible, collaborative teaching environment between the classroom teaching spaces.
• CR11 - Whiteboard storage unit - Provide and install a fixed whiteboard storage unit into the classroom. Mikes Wood shop or similar type (or similar), with adjustable shelving and lockable cupboards. For the storage of classroom resources. Include provision for storing and charging laptops.
No Winner School not continuing with project