Tender Closed
|
|
RFx ID : | 17951686 |
Tender Name : | Special Needs Modifications (major works - Pt 1) at Pukekohe East School |
Reference # : | WS168250 |
Open Date : | Wednesday, 28 September 2016 9:00 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Tuesday, 18 October 2016 5:00 PM (Pacific/Auckland UTC+13:00) |
Department/Business Unit : | EIS |
Tender Type : | Request for Proposals (RFP) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
All communications with the Buyer must be made via the GETS tender question/answer function |
Alternate Physical Delivery Address : | |
Alternate Physical Fax Number : | |
Agency Address : | NEW ZEALAND |
As part of the MoE’s special needs modification programme, the MoE identifies and remedies specific accessibility issues for individual students with special needs at the School. This process is carried out on a case by case basis, with an Occupational Therapist reviewing the school property and making modification recommendations to the MoE EIS team for implementation through the CDP programme. The Special Needs Modifications (major works – Pt 1) at Pukekohe East School are a component of the wider SNM CDP (Batch 7.0 & 7.2) project which commenced in 2013.
The general scope of the Special Needs Modifications (major works – Pt 1) at Pukekohe East School includes the upgrade of the existing surface storm-water treatment and disposal system in conjunction with the redevelopment of the School’s entry drive area and adjacent linking footpaths/ ramps/ steps etc to provide an accessible exterior link from the car park area to the Main Hall building, and the nearby Satellite Classrooms.
The services required is that of a main construction contractor to undertake the construction works of the Special Needs Modifications (major works – P 1) at Pukekohe East School in accordance with the attached documentation. The successful main construction contractor will be engaged by the MoE under the MoE modified NZS3910:2003 construction contract, administered by designgroup architects h+k.
No Winner