RFx ID : | 19135017 |
Tender Name : | CON2017099 Havelock North Trunk Watermain |
Reference # : | CON2017099 |
Open Date : | Friday, 13 October 2017 6:00 PM (Pacific/Auckland UTC+13:00) |
Close Date : | Wednesday, 1 November 2017 4:00 PM (Pacific/Auckland UTC+13:00) |
Department/Business Unit : | Assets - Water Services |
Tender Type : | Registration of Interest (ROI) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Required Pre-qualifications : | None |
Contact : |
Amy Patterson-Horner amy.patterson-horner@stantec.com 027 518 2382 |
Alternate Physical Delivery Address : | ONLY EOI SUBMISSIONS RECEIVED IN THE HDC TENDER BOX WILL BE ACCEPTED (as per EOI document) |
Alternate Physical Fax Number : |
Scope
Expressions of Interest are invited for a proposed trunk water main (approximately 5km) from Hastings to Havelock North and associated works. The proposed route alignment is predominantly within the live traffic lane from the Heretaunga St/Sylvan Rd intersection via St Aubyn St, Windsor Ave, Howard St, St Georges Rd, Crosses Road to the Napier Rd/Karanema Dr intersection. This work involves:
Health & Safety, Traffic and Environmental Management
Quality Management, Testing, and As-builts
Public liaison and communication with the community and directly affected parties
Preconstruction services and site investigations
Temporary Works Design for trench shoring and dewatering if required
Complete installation of approximately 4,100m of DN500 Concrete Lined Steel trunk watermain and approximately 1,100m of DN375 trunk watermain (material to be determined) predominantly via open cut construction including:
Connections to existing water network
Scours and hydrants
Air valves
Isolation valves
Pipe crossing suspended from the existing Crosses Rd bridge including expansion joints
All associated fitting, pipe specials and thrust restraint
On-line renewal and upgrade of approximately 500m of DN300 PVC foul sewer main with 8 No. DN1050 manholes and associated lateral connections.
Complete installation of approximately 150m of DN150 PE sewer rising main
Full reinstatement likely to include road pavement, chip seal and asphaltic concrete surfacing, berms, kerb and channel, traffic islands/roundabouts, and light poles.