You are not logged in.

Contract 895 Tapanui WS AC Pipeline Renewals

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 30809147
Tender Name : Contract 895 Tapanui WS AC Pipeline Renewals
Reference # :
Open Date : Wednesday, 11 December 2024 2:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Friday, 31 January 2025 5:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 83101500 - Water and sewer utilities
Regions:
  • Otago
  • Southland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Ahmed Azazy
ahmed.azazy@cluthadc.govt.nz
029 0238 4404
Alternate Physical Delivery Address  : CDC Office - 1 Rosebank Terrace, Balclutha
Alternate Physical Fax Number  :
Overview

Clutha District Council (CDC) are inviting tenders from suitably experienced contractors for the above contract. CDC will publish the Tender on GETS.
The extent of the work is described in this Request for Tender document and key items of work are:

Supply and installation of 1,050m (approx.) of new 125OD PE100 water supply main on Northhumberland St, Warwick St, Cemetery Road, Devon St, Cumberland Place, Somerset Crescent.

Supply and installation of all valves, fixtures and lateral service connection pipework to reinstate water supply to affected properties.

Testing, chlorination, de-chlorination and commissioning of the new water main and connection into the existing public networks as shown on the Drawings. Work in compliance with CDC-Rule G11: “Hygiene Code of Practice”.

Organising for Council and Engineer witness of all requirement compliance testing, including council operations team liaison and witness when connecting the new water main to the public water supply network.

Obtaining of all required permits and approvals to undertake the work, including supply of water for pipeline commissioning.

Decommissioning and abandonment of the existing water supply main, extent as shown on the drawings.