You are not logged in.

Request For Tender For Bridge 189 Main North Line (MNL) Marlborough, South Island Bridge and Stock Underpass Replacement

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 29364241
Tender Name : Request For Tender For Bridge 189 Main North Line (MNL) Marlborough, South Island Bridge and Stock Underpass Replacement
Reference # : 2024/050
Open Date : Thursday, 9 May 2024 1:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Monday, 1 July 2024 2:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 72000000 - Building and Facility Construction and Maintenance Services
  • 78000000 - Transportation and Storage and Mail Services
Regions:
  • New Zealand
Exemption Reason : None
Required Pre-qualifications : None
Contact : Tuan Nguyen
tuan.nguyen@kiwirail.co.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Bridge 189 on the Main North Line (MNL), Marlborough, South Island is being replaced together with the existing stock underpass.
To ensure dairy farm operations are maintained the underpass will be constructed 1st as a separate structure, approximately 20m south of the bridge.
Using the non-active control level crossing north of the bridge for stock movements is not feasible due to the high risk of stock vrs train contact.
The services required under this RFT include, but are not limited to, the following:
• Supply and Install a new stock underpass 20 metres south the bridge before the bridge is replaced so dairy farm operations are not interrupted and to separate stock from the bridge construction zone.
• Supply and install the new bridge abutment piers and associated riprap.
• Install new bridge trough beam
• Relocate “Whale Trail” cycleway away from construction zone and reinstate after project is complete