Tender Closed
|
|
RFx ID : | 17986527 |
Tender Name : | Wood Energy South Feasibility Funding |
Reference # : | |
Open Date : | Tuesday, 4 October 2016 9:00 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Saturday, 31 December 2016 5:00 PM (Pacific/Auckland UTC+13:00) |
Tender Type : | Notice of Information (Advance Notice) (NOI) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Required Pre-qualifications : | None |
Contact : |
Cathy Jordan cathy@venturesouthland.co.nz 0274680530 |
EECA has funds available to assist businesses with wood energy projects and welcomes applications as part of the Wood Energy South Project. Feasibility Grants are available for projects that are likely to lead to Capital investment with good demonstration potential that lead to wood-based bioenergy is being produced or used in Industrial or Commercial operations and a published case study.
Eligibility
Projects must satisfy the following criteria:
- Wood-based bioenergy is being produced or used in Industrial or Commercial operations.
- There is a clear benefit to the wood energy sector in Southland, either the supply or demand side, i.e. strategic value and potential for widespread industry adoption. These may include, for example:
- The potential use of wood fuel to replace fossil fuels
- The improvement of a supply chain for wood fuels
- Conversion of boilers to wood-firing
- At the time of applying for the grant, a commitment has not already been made for goods or services, i.e. contract signed or deposit paid.
- The project will lead to increased wood energy use, i.e. it is not just pure research.
- Installed Heat Plants must meet Regional air quality standards
- A feasibility study must be undertaken by a suitably qualified consultant without vested interest in any equipment involved in the project concerned unless approved by EECA.
- Be economically viable
If you have any questions about these criteria, please contact Wood Energy South before proceeding.
EECA will fund:
• either up to 75% of the costs of the feasibility study to a maximum of $15,000.00; or
• up to 40% of the costs of the feasibility study up to a maximum of $50,000.
Recipients may apply later for a Capital Grant or Crown Loan to help implement the project.
www.woodenergysouth.co.nz